This is the third project awarded to design build facades by the Museum. The first at Tring in 2019 was the external refurbishment of the Ornithology Building and then in 2020 works were undertaken to replace the curtain walling of the Palaeontology Building, Kensington. design build facades are Principal Designer and Principal Contractor on this
Posts Tagged:NHM
This evocative image was captured as the final scaffolding was removed from the refurbished Natural History Museum’s Palaeontology Building, Kensington, revealing the reflection of the Victoria and Albert Museum in the replaced curtain walling and set against the now pristine concrete facade.