Denning Point Aldgate, Tower Hamlets

NON-COMBUSTIBLE

Following the Grenfell Tower fire EEH responded by removing the combustible cladding as quickly as possible. EEH’s main contractor for the Denning Point works, Kiers Specialist Services, appointed design build facades to re-clad the building in order to meet A1 Fire classification, the system chosen comprising solid aluminium cladding panels, mineral wool insulation, full-fill cavity barriers in horizontal positions and intumescent cavity barriers in vertical positions.

Denning Point is a 23-storey residential tower in Aldgate, Tower Hamlets, owned and managed by EastEnd Homes (EEH). Originally constructed in 1968, the concrete facade was clad with combustible ACM in 2014.

The client and local planning officers were keen to ensure that the appearance of the re-clad building closely resembled the appearance pre-works. design build facade’s innovative technical solution involved cleverly re-using the original support structure which was already set out for the existing geometry of the building and to correct line and level. This approach not only expedited project delivery and reduced cost, it also lessened noise to residents throughout the delivery process and by re-using the existing support structure environmental waste was minimised.

Client: EastEnd Homes (EEH)
Main Contractor: Kiers Specialist Services
Building: Denning Point
Project Duration: May 2020 – April 2021
Contract Value: £1.7m

Original 1960s facade

Before re-cladding

After

KEY OUTCOMES

Resident safety assured with A1 fire-rated cladding installed

Re-use of the original
support structure to reduce cost, waste and expedite the project.

Re-cladding, matched the original look of the building

Completed whilst fully
occupied with minimum disruption to residents

Building life extended by more than 60 years.