Fire safety works to modern multistorey building in Bournemouth involving removal and replacement of extensive rendering and non-compliant metal cladding. All works carried out whilst building, which comprised of 113 one, two and three bedroom apartments, was fully occupied.
Berry Court,
Bournemouth
NON-COMBUSTIBLE
Client: Abri Homes, Mark Sayer, Director of Safety & Resilience – Abri Group
Main Contractor: design build facades
Programme: February 2022 – June 2024
Contract Value: £4.3m
KEY OUTCOMES
- Resident safety is assured with A2 – s1, d0 fire-rated cladding installed
- Best value achieved by a solution with long-term integrity surpassing current standards
- High-quality refurbishment that matches the original visual look of the building
- Completed whilst fully occupied with minimum disruption to residents