Byron & Linden House,
Slough

NON-COMBUSTIBLE

d+b facades undertook fire safety and re-cladding works to two 13 storey residential tower blocks (192 flats), Byron House and Linden House, Slough for Abri.

Using d+b’s secret fix aluminium cassette system with fully integrated, super high performance, composite, Nordan, tilt turn windows. A system that has been in use for 30 years old, meets 2020 regulations and is today, proven to work, without cleaning or maintenance, for 30 years.

Client: Abri

Main Contractor: d+b facades

Programme: September 2020 – October 2021

Contract Value: £6.4m

Procurement Method: Hyde Fire Safety Framework

Before

After

Before

After

Before

During

Related Works