- Client: Caledonian University
- Programme: June 1997 – September 1997
- Contract Value: £750k
- Scope of Work: Contract awarded for the design and build of an aluminium rainscreen and window replacement solution to a major education building. Significant features include: building in occupation, brise soleil to roof and curtain wall installed. The whole project was planned and executed to be carried out during the term summer shutdown
Caledonian University, George Moore Building
NON-COMBUSTIBLE
PROJECT SCOPE
The project comprised design and build of an insulated aluminium rainscreen and replacement windows. Additional works undertaken included brise soleil to the roof and curtain walling to the principal staircase. The project was planned and executed to be carried out during the summer term shutdown.
CLIENT TESTIMONIAL
“We have switched off the boilers since the new, highly-insulated cladding system has been installed. Classrooms which were either drafty and cold in winter, or hot and poorly ventilated in summer, are now comfortable and economic to run all year – they look great too!”.
George Scott, Head of Estates