Berry Court,
Bournemouth

NON-COMBUSTIBLE

Fire safety works to modern multistorey building in Bournemouth involving removal and replacement of extensive rendering and non-compliant metal cladding. All works carried out whilst building, which comprised of 113 one, two and three bedroom apartments, was fully occupied.

Client: Abri Homes, Mark Sayer, Director of Safety & Resilience – Abri Group

Main Contractor: design build facades

Programme: February 2022 – June 2024

Contract Value: £4.3m

KEY OUTCOMES

  • Resident safety is assured with A2 – s1, d0 fire-rated cladding installed
  • Best value achieved by a solution with long-term integrity surpassing current standards
  • High-quality refurbishment that matches the original visual look of the building
  • Completed whilst fully occupied with minimum disruption to residents
  • All the render that was removed was recycled locally