We are at AUDE 2020 We will be attending AUDE 2020, held at the Edgbaston Park Hotel and Conference Centre, University of Birmingham. We look forward to meeting old friends and new, come and talk to us on Stand 14.
Archive for: 2020,
d+b facades is pleased to announce that it has been appointed to the Fusion21 Energy Efficiency Framework as a design and build overcladding specialist for projects UK-wide. This is a specialist framework to support energy efficiency improvements. Lot 3 of the Framework covers cladding and associated works which can be applied to both domestic and
d+b facades are pleased to announce that it has been appointed to the Hyde Fire Safety Works and Services Framework as a design and build overcladding specialist. This framework was created to ensure best practice, compliance, assurance, quality, innovation and resident safety is at the heart of the fire safety measures. Lot 10 of the
d+b facades are pleased to announce it has have been awarded the contract to remove existing cladding from a 6 storey block for East Coast College at its Lowestoft Campus on St Peter's Street and replace with an A1 Vitradual cladding system. Originally built in 1961, the block was clad in ACM panels in 2014.
12